TAMCO    ¦    Thompson Architectural Metals Company

OUR SALES TEAM IS READY FOR YOUR CALL  (800) 248-3456                                                       
Thompson Architectural Metal Roofing is proud to be a partner of the 
Energy Star® Roof Products Program
  

Download TAMCO Manuals, Florida Approvals & Installation Guides Today!       

See a Video Presentation of our Company Products, Capabilities &  Facilities

Click on Image for Video

 

 

 OFF RIDGE SHINGLE FLAT SPOILER

Preparation
Minimum 4/12 pitch required.Cut out the off ridge opening in the roof sheathingas shown in Figure A. Size the opening inaccordance with the correct cutting data modelsand locate the opening 6" minimum off the peak ofthe roof as shown in Figure B. For single ventapplications, install vent as close to the center ofthe roof length as possible. Install multiple vents inevenly spaced areas of the entire roof length.Do not cut into trusses or rafters when cuttinghole in the roof.

                                                       

Fitting
Remove interfering shingle nails around theperimeter of the opening. Slide top and side flangesof the vent up and under shingles. Allow the bottomvent flanges to lay on top of shingles.

Mounting

Care should be taken in keeping the vent properlyaligned. Nail in place using 1-1/4" coating roofingnails spaced approximately 6" - 12" on center and1-1/2" from each end. Roofing cement should beapplied to all shingle edges and nail heads toprevent water leakage. In severe weather coastalconstruction zones, caulking around entireperimeter, under vent flanges and near outer edgesis recommended.

Off Ridge Roof Vent Installation
          Download Pdf


Florida Building Code 11100.4